Hubbardston Library Trustees Approve Lower-Level Renovation at Nearly $48,000

HUBBARDSTON — July 9, 2026 — Hubbardston Library Trustees voted unanimously Thursday to proceed with a lower-level renovation project at a base cost of $47,985, with the final figure expected to rise once a contractor contingency fee is added. Library Director Christine Barbara presented a quote revised during a same-day site meeting that swaps existing hardwood floor refinishing for luxury vinyl plank flooring at $6,500, adds $1,200 for office painting, and calls for replacement of all walls and ceilings to address surface mold — changes trustees endorsed without dissent. Payment flows through the Community Preservation Committee's warrant system, and trustees are strategizing to align the project's two-to-three-week completion window with an August warrant cycle to avoid a late-payment surcharge; CPC Chair Danielle Ericalian and Treasurer Susan Worth will be contacted to coordinate. The board also acknowledged two vacancies and re-nominated Chair Morgan Brinker to continue in her role.

Keep reading with a 14-day free trial

Subscribe to The Hubbardston MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Hubbardston MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Worcester County News · The Lancaster Post · The Leicester Post · The Leominster Post · The Lunenburg Post · The Mendon Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.